Brookforge Swimming Pool Build

Sector

The sector which the pool fits into

Culcheth Pool Commissioned

steam room pool view

Working alongside the clients’ architect, a luxury new build swimming pool has been completed close to the city of Warrington. The pool hall includes a fully insulated swimming pool, beautiful water features, steam room and sauna, all expertly constructed by Brookforge. In addition Brookforge installed a fully automated plant room and air handling systems to […]

Culcheth Pool Commissioned Read More »

Completed Pools, Domestic, Energy Efficient, Indoor, Insulated, Sauna, Steam Room, Swimming Pool, Water Features

Stands the Test of Time…

deck Level Overflow Slatted Cover Opening

A swimming pool which was completed back in 2014 still looks as impressive as the day it was first commissioned. The deck level overflow pool had a minor fault maintaining its water level, after closer inspection our engineers found a faulty solenoid on the besgo valve which maintains the balance tank levels. A quick fix

Stands the Test of Time… Read More »

Completed Pools, Domestic, Energy Efficient, Indoor, Insulated, Overflow/Deck Level, Swimming Pool

Carbon neutral pool for an open water swimmer

ICF pool construction

With technological advances in solar/heat pump/ICF/insulation and automation, carbon neutral pools are potentially going to become a reality.

Carbon neutral pool for an open water swimmer Read More »

Case Study 19-500, Domestic, Energy Efficient, ICF, Insulated, Outdoor, Portfolio, Swimming Pool, Work in progress

Concrete Day!

It’s the fifth day on the new pool build and we’re ready for concrete! The insulated concrete form-work we use for our swimming pool shells requires the concrete to be pumped in (via a concrete pump) in a loose liquid form. Usually pumped via a long boom it means we can reach even the hardest

Concrete Day! Read More »

Domestic, ICF, Insulated, Swimming Pool, , , , ,

Pool ready for concrete!

After four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have been added. Final checks are made, the drawings are triple-checked and the braces are laser aligned. Everything is now ready for an early start the

Pool ready for concrete! Read More »

Domestic, ICF, Indoor, Insulated, Skimmer, Swimming Pool, , ,

ICF Swimming pool shell is up in three days

The beauty of using insulated concrete form-work for constructing your pool is not only the thermal efficiencies and cost savings, but it’s quick, really quick!! The ICF blocks are lightweight and easy to handle, meaning one person could move an entire pool shell by hand to it’s location with ease. The wall ties are high

ICF Swimming pool shell is up in three days Read More »

Domestic, ICF, Insulated, Swimming Pool, , ,

Swimming Pool Plant Room Installation

Cliff side infinity pool

Brookforge pool engineers recently helped complete a swimming pool plant room installation for a cliff edge pool in Salcombe. The pool was built and tiled by a local pool company and Brookforge took over to install all the pool shell fittings and install/test/commission the highly automated pool plant room. Working directly for the owner; our

Swimming Pool Plant Room Installation Read More »

Domestic, Infinity, Outdoor, Overflow/Deck Level, Plant Room, Swimming Pool, , , , , ,

Installing swimming pool balance tank

Lifting balance tank into position

With any overflow pool the ability to maintain the flow of water can be achieved with a swimming pool balance tank. The swimming pool balance tank allows for surges of water from the overflow channel to be temporarily stored so a constant flow of water can be maintained through the plant room water treatment systems. Below

Installing swimming pool balance tank Read More »

Domestic, Infinity, Outdoor, Overflow/Deck Level, , , , ,
Scroll to Top