Brookforge Swimming Pool Build

Pool ready for concrete!

ICF Pool Shell BracedAfter four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have been added.

Final checks are made, the drawings are triple-checked and the braces are laser aligned. Everything is now ready for an early start the following morning, when the concrete is to be pumped into the ICF walls.

 

 

ICF Pool Shell Fully BracedQuadlock Pool BracesPool Shell Strong Backs

 

author avatar
Pool Build
Scroll to Top