Brookforge Swimming Pool Build

Sector

Explore Pool Build swimming pool projects across domestic, commercial and specialist settings. Each sector brings different design, operational and technical considerations.

Work begins on 15m outdoor pool

Brookforge prepared the construction drawings for the groundworks team to install the reinforced concrete base slab. With the foundation in place, work could begin on the Quad-Lock insulated concrete formwork (ICF) pool walls. Galvanised track establishes the wall positions, while vertical reinforcement is anchored into the slab and horizontal steel is incorporated as each course

Work begins on 15m outdoor pool Read More »

Domestic Pools, Featured, ICF, Insulated, Outdoor, Skimmer, Swimming Pool, Work in progress

A Successful Concrete Pour

After the careful assembly, reinforcement and bracing of the Quad-Lock insulated concrete formwork (ICF), the Hill Top Beach Pool reached one of the most demanding stages of construction: the concrete pour. On this exposed Worcestershire hillside, preparation was everything. Pour Day: Where Preparation Counts For an ICF swimming pool shell, placing concrete is a critical

A Successful Concrete Pour Read More »

Domestic Pools, ICF, Swimming Pool

Braced and ready for Concrete!!!!

With the Quad-Lock insulated concrete formwork (ICF) walls assembled and reinforced, the Hill Top Beach Pool project reached another important milestone: preparing the swimming pool shell for its concrete pour. These photographs capture the bracing and preparation stage on the exposed Worcestershire hilltop site. Supporting the ICF Walls Before the Pour Before concrete is placed,

Braced and ready for Concrete!!!! Read More »

Domestic Pools, ICF, Swimming Pool

Plant room manifolds installed at the early stages of construction.

Swimming pool plant room manifolds

Just as it’s easier for us to build a pool in a basement before a house is constructed above it, it’s also a lot easier to start an install of a swimming pool plant room at its earliest stages. At a new pool build in South Cerney we were able to install the main plant

Plant room manifolds installed at the early stages of construction. Read More »

Domestic Pools, Plant Room, Skimmer, Swimming Pool, Work in progress

Hill top swimming pool shell construction begins

Quadlock pool shell construction

Construction of the Hill Top Beach Pool shell began on a steep Worcestershire hillside, where access and winter weather made careful planning essential. Quad-Lock insulated concrete formwork (ICF) was well suited to this location: the lightweight panels could be transported to the elevated site and assembled on the concrete base slab prepared by the groundworks

Hill top swimming pool shell construction begins Read More »

Domestic Pools, ICF, Indoor, Insulated, Swimming Pool, Work in progress,
Scroll to Top