Work begins on 15m outdoor pool
Brookforge prepared the construction drawings for the groundworks team to install the reinforced concrete base slab. With the foundation in place, work could begin on the Quad-Lock insulated concrete formwork (ICF) pool walls. Galvanised track establishes the wall positions, while vertical reinforcement is anchored into the slab and horizontal steel is incorporated as each course
Work begins on 15m outdoor pool Read More »
Domestic Pools, Featured, ICF, Insulated, Outdoor, Skimmer, Swimming Pool, Work in progress







