Brookforge Swimming Pool Build

Basement

Swimming pools that are constructed within a basement of a property come with a whole new array of issues, which must be addressed in order for the project to succeed. Brookforge have completed many indoor swimming pools in the basements of new and existing developments, here are just a few.

Basement Pool in ICF House

Working alongside the Nudura Uk distributer, Brookforge were brought in to build a ICF swimming pool which would be integrated within a new build Nudura ICF house. The two different ICF systems worked together; with the swimming pool making use of the buildings’ basement walls for 2 sides of the pool walls. Brookforge also installed […]

Basement Pool in ICF House Read More »

Hidden overflow pool and spa in basement of new build house

Overflow spa with massage jets

A new build house in Hale, Greater Manchester required a luxury basement pool and spa to compliment a wellness suite. Working directly with the customer and liaising with their architect ensured Brookforge could design and build a hidden overflow pool and spa which fitted within the desired budget. As this was a basement pool project

Hidden overflow pool and spa in basement of new build house Read More »

London Basement Swimming Pool and Steam Room

This London basement swimming pool and steam room project was a luxury design & build project which was first planned way back at the end of 2013. The project required a pool, a steam room, a fully automated plant room and pool hall air handling system which would maintain a pleasant environment in the basement

London Basement Swimming Pool and Steam Room Read More »

Pool wall construction begins in London basement pool

Pool Hall Wall

Work begins for the pool wall construction on a twin depth basement swimming pool in London. The walls are being constructed using the Quadlock Insulated Concrete Form-work (ICF) system and is being built on a reinforced slab installed by the existing site workers from Brookforge drawings. The shallow water depth is 1.3m going down to

Pool wall construction begins in London basement pool Read More »

New build basement swimming pool

Digging a basement pool hall

Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down to a deep end water depth of 2m. The pool will be a skimmer pool

New build basement swimming pool Read More »

Scroll to Top