Brookforge Swimming Pool Build

Commercial

Commercial Swimming Pools present a different set of issues which need to be addressed. Primarily it’s the high bather load which is the first concern.

Refurbishment of school pool

Refurbish School Swimming

Brookforge Ltd. have recently completed a complete refurbishment of the pool at Dean Close School, one of Cheltenham’s oldest and most prestigious private schools. After many years of faithful service the original pool had developed problems due to it’s age and constant use by the school and private clubs. Once the pool had become unusable […]

Refurbishment of school pool Read More »

Leisure Centre Wellness Suite

Steam Room and Sauna

As part of a major refurbishment of a pre-existing Leisure Centre close to Swindon, Brookforge were asked to help design, build and install a brand new Wellness Suite. Included in the Wellness Suite was a Spa, a Sauna and a Steam room with all the associated plant room equipment required to maintain a safe and

Leisure Centre Wellness Suite Read More »

School overflow pool commissioned

School Overflow Pool

A new build school overflow pool has been commissioned by Brookforge Poolbuild engineers. Working along side the council architects and builders, Brookforge helped with the design and build on this unique school pool. As well the design of the pool structure, we specified and installed all the plant-room equipment to meet with all safety standards

School overflow pool commissioned Read More »

Pool Pipework Installation for School Pool

Commercial Plantroom

Brookforge can offer assistance an expertise for Pool Pipework Installation and the associated plant room equipment and hydraulics when working alongside all of your contractors. That was certainly the case with a recent project in north London. The client was a small Primary school, who elected a contractor of choice to construct both pool and pool

Pool Pipework Installation for School Pool Read More »

Hydrotherapy Spa Completed

Hydrotherapy Massage bench

Hydrotherapy Spa Completion A New Hydrotherapy Spa has been completed a school for children with disabilities and is now fully up and running. This hydrotherapy spa was constructed using the Quadlock ICF system so the shell was highly insulated and kept heat losses are kept to a minimum. As the Spa had a beach area with grill covered

Hydrotherapy Spa Completed Read More »

Hydrotherapy Spa Tiled, East Sussex

hydrotherapy massage bench being tiled

The tiling for the Hydrotherapy Spa has been finished, all that remains are the finishing touches to complete the surround. The spa comprises four separate seats and an air massage bed in the middle. There are both air and water jets, and color changing lights that contribute to the sensory experience. If you are interested

Hydrotherapy Spa Tiled, East Sussex Read More »

Hydrotherapy Spa Rendered, East Sussex

Hydrotherapy Spa Rendered Using specialist products, which can be found on our Pool Construction Products, the Quad-Lock shell is rendered prior to tanking. The bench in the middle is an air massage bed, which will be both sensory and relaxing for its users at this specialist school for children with disabilities.

Hydrotherapy Spa Rendered, East Sussex Read More »

Concrete Poured – Hydrotherapy Spa, East Sussex

overflow spa after concrete poured into ICF

Concrete Pour Complete Because the structures are unified, both the balance tank and hydrotherapy pool are poured as one. This ensures a homogeneous mix without the risk of cracking which can occur when two mixes are poured at different intervals. The concrete will be allowed to cure before the removal of supports, the project will

Concrete Poured – Hydrotherapy Spa, East Sussex Read More »