Work has begun on a new build outdoor pool in the the Chilterns near High Wycombe. The swimming pool has been designed by liaising direct with the clients and the initial pool slab has been constructed by local contractors using the drawings and structural calks provided by Brookforge.
The reinforced concrete slab had a 5 days to cure before we could start on the construction of the pool walls at the start of this week. The initial pool shape was marked and had track for the walls cut to size. The Quadlock walls are then constructed in the track and the size and feel of the pool begins to take shape. Once the first course is complete the pool position, location and proportions are double checked and squared up. Now the pool location is finalized the pool wall vertical steal are drilled and anchored into the pool slab and the next courses can fly up within the space of 2 days.
New Build Outdoor Pool Gallery – Week 1
By the end of week 1 on site the walls of this new build outdoor pool are complete and the bracing is added to ensure all walls are kept during the subsequent concrete pour.
Reinforced Concrete Pool Slab
First Course Quadlock Pool Blocks
Reinforced Pool Wall Vertical Steels
Reinforced Pool Wall Horizontal Steels
Pool Cover Pit Corner Detail
Quadlock Pool Wall Panels
Quadlock Wall Ties Added
Hidden Cover Pit
Quadlock Infinity Edge
Quadlock Pool Safety Ledge
Top Quadlock Course for Infinity Edge Pool
Safety Ledge
Pool Infinity Edge
Safety Ledge Ends at Cover Pit
Pool Wall Bracing
Infinity Wall Bracing
Swimming Pool Bracing
ICF Shuttering Braced
ICF Swimming Pool Shell ready for concrete
New Build Outdoor Pool Gallery – Week 2
Concrete pump setup
Pool concrete pump
Concrete pump boom test
Safety Ledge after concrete
Installing drainage pipework
Test fitting drainage channel
Infinity edge drainage channel
Feature bench steelwork
Feature bench shuttering
Bench shuttering construction
Feature bench bracing
Overflow channel shuttering
New Build Outdoor Pool Gallery – Week 3
Concrete pump arrives onsite
Concrete pump sets up onsite
Pumping concrete into wall
Smoothing off concrete
Post pour overflow concrete
Pool Wall Shuttering
Checking after concrete pour
Pool Concrete finished
Smoothing off concrete bench
Shuttered overflow wall
Finished overflow gutter
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.