Brookforge Swimming Pool Build

Skimmer

Skimmer swimming pools usually have a water level which is below the finished pool surround finished floor level. Skimmers remove any surface debris from the pool water and take it back to the plant room for filtration and treatment. Below is a selection of Skimmer swimming pool projects completed by Brookforge.

Pool wall construction begins in London basement pool

Pool Hall Wall

Work begins for the pool wall construction on a twin depth basement swimming pool in London. The walls are being constructed using the Quadlock Insulated Concrete Form-work (ICF) system and is being built on a reinforced slab installed by the existing site workers from Brookforge drawings. The shallow water depth is 1.3m going down to […]

Pool wall construction begins in London basement pool Read More »

New build basement swimming pool

Digging a basement pool hall

Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down to a deep end water depth of 2m. The pool will be a skimmer pool

New build basement swimming pool Read More »

Pool Shell Construction & Concrete Pour

Basement swimming pool during construction

Basement Level Pool Shell Construction The pool structure comprises three walls at 1.4m, with the fourth wall at full ceiling height; supporting the concrete floor above. The cover will be housed in a ‘cave’ formed by a cantilever lid. This lid is tied in and cast with the walls. The pool features two stainless steel

Pool Shell Construction & Concrete Pour Read More »

New Basement Pool Project, London: Slab Installation

[slideshow id=27] Reinforced concrete slab designed to withstand the force of a large volume of water. The following day, construction of the pool shell can begin. It doesn’t take long before the shape of the final product emerges. [12-1129]

New Basement Pool Project, London: Slab Installation Read More »

Tiling Nears Completion, Cheltenham

Luxury swimming pool being tiled

The surround tiles have nearly been finished, with the pool tiles not far behind. Stainless steel skimmers with an automatic top-up have been installed. A chromed stainless steel faceplate will be installed after tiling is finished. To view the construction products used please follow this link.

Tiling Nears Completion, Cheltenham Read More »

Refurbishment Project: Tiling begins, Cheltenham

Tiling of swimming pool shell walls

Tiling has begun at our local site, a refurbishment project to both house and modernise a dated, outdoor pool. The previous tiles have been removed, the shell has had its depth increased and has been tanked. The tile adhesive used is a rapid curing, water resistant product. More about the adhesive can be found here.

Refurbishment Project: Tiling begins, Cheltenham Read More »

Case Study: Renovation in Progress, Cheltenham

Case study pool tanking

The client wanted to house and modernise his outdoor swimming pool. Brookforge have provided consultation and specialist installation services to assist the client in achieving his goals.

Case Study: Renovation in Progress, Cheltenham Read More »

Refurbished Pool Shell is Tanked, Cheltenham

Swimming waterproof pool tanking being applied

Spray tanking system Using a spray application greatly reduces the time it takes to tank a pool shell. This method also ensures an even application with full control over flow. Here we are using a rapid curing, cementitious based tanking slurry. A further two coats will be applied before tiling. As the depth has been

Refurbished Pool Shell is Tanked, Cheltenham Read More »