Brookforge Swimming Pool Build

Technical

Information on the different techniques used when constructing swimming pools.

Plant Room Pipework Installation, New Forest

swimming pool plant room pipe work

Plant Room Pipework Installation Plant room pipework is installed before the floor is screeded. The first stages of a plant room installation revolves around the placement of the suctions and return pipes. At Brookforge we believe that every stage of the plant room installation must be planned in advance to ensure ample spacing is left […]

Plant Room Pipework Installation, New Forest Read More »

Hydrotherapy Spa Rendered, East Sussex

Hydrotherapy Spa Rendered Using specialist products, which can be found on our Pool Construction Products, the Quad-Lock shell is rendered prior to tanking. The bench in the middle is an air massage bed, which will be both sensory and relaxing for its users at this specialist school for children with disabilities.

Hydrotherapy Spa Rendered, East Sussex Read More »

Setting Out Hydrotherapy Pool, East Sussex

Setting out hydrotherapy spa walls

Brookforge have undertaken a new project at a school which educates children with disabilities. We are constructing a specialist hydrotherapy pool which will be both stimulating and relaxing for its users; the older children. The pool will include a series of lights and jets, and will feature an air massage bed. For more information on

Setting Out Hydrotherapy Pool, East Sussex Read More »

Refurbished Pool Shell is Tanked, Cheltenham

Swimming waterproof pool tanking being applied

Spray tanking system Using a spray application greatly reduces the time it takes to tank a pool shell. This method also ensures an even application with full control over flow. Here we are using a rapid curing, cementitious based tanking slurry. A further two coats will be applied before tiling. As the depth has been

Refurbished Pool Shell is Tanked, Cheltenham Read More »

Scroll to Top