Brookforge Swimming Pool Build

Outdoor

An outdoor swimming pool can be the perfect place to relax and unwind in the summer months, but with extended season equipment and the correct planning it is possible for you to use your pool for most, if not all of the year.

New Forest: Concrete Pour

reinforced concrete pool lid being poured

Today we have successfully poured 52 cubic metres of concrete to form the walls, balance tanks and cover lid. As this post goes live, the concrete is curing; resisting the low temperatures with double sided insulation. This stage is a key development within the project and could not be achieved so quickly with alternative pool

New Forest: Concrete Pour Read More »

New Forest: Pool Braced for Concrete Pour

swimming pool shell braced ready for concrete

Quad-Lock is one of the more adaptable ICF systems, which enables alterations in the design to accommodate features such as steps, overflow channels, cover pits and balance tanks. To find out more about hidden cover options see here for further details. For any questions regarding ICF construction please get in touch here. [12-150]

New Forest: Pool Braced for Concrete Pour Read More »

Completion: Self Contained Plant Room, Destination Nigeria.

shipping container pool plant room

This recently completed self-contained plant room has been entirely built inside a standard 20 foot shipping container. The client in Nigeria required a commercially rated system with automatic chemical dosing amongst other automatic features. The plant room has been fully tested using a large tank of water to simulate the high volume turnover it was

Completion: Self Contained Plant Room, Destination Nigeria. Read More »

New Forest: Quad-Lock Construction Update

ICF quad lock pool walls in construction

The majority of the Quad-Lock structure has been completed, along with reinforcement steels. The remainder of structure will be completed shortly and prepared for concrete pouring. The top of the Quad-Lock walls are cut to laser level ensuring that any inaccuracies in the slab are overcome before the finished floor level. [12-150]

New Forest: Quad-Lock Construction Update Read More »

New Forest: New Insulated Pool Build

ICF pool walls being set out

A new insulated outdoor pool project in Hampshire, using the Quad-Lock ICF (Insulating Concrete Form-work) system. Brookforge have pioneered the use of Quad-Lock in swimming pool construction and with Quad-Lock being so flexible, it is our ICF of choice. To read more about the Quad-Lock system read here. Setting out is a critical stage of the

New Forest: New Insulated Pool Build Read More »

Completion: Luxury Deck Level Pool and Spa

A perfect union of minimalism and grandeur. It is hard to believe that a commercially rated, fully insulated 18m swimming pool and separate spa are concealed within this subtle design. With the covers open, the space in front of the house is transformed into an area of tranquility and repose, a space in which to socialise, entertain and soak

Completion: Luxury Deck Level Pool and Spa Read More »

Scroll to Top