New Forest ICF Swimming Pool Braced for Concrete Pour
The Quad-Lock ICF swimming pool project in the New Forest reached the stage where the reinforced formwork was braced in preparation for the concrete pour.
Preparing ICF Pool Walls for Concrete
Bracing supports the formwork during construction and helps maintain the intended wall alignment as the pool shell is formed.
Flexible Pool Design Details
The Quad-Lock system can be adapted to incorporate steps, overflow channels, concealed cover pits and balance tanks as part of the structural design.
New Forest Construction Updates
Follow the earlier wall construction stage or subsequent concrete pour update.
Project reference: 12-150