The majority of the Quad-Lock structure has been completed, along with reinforcement steels. The remainder of structure will be completed shortly and prepared for concrete pouring. The top of the Quad-Lock walls are cut to laser level ensuring that any inaccuracies in the slab are overcome before the finished floor level.
[12-150]