Brookforge Swimming Pool Build

ICF

ICF stands for Insulated Concrete Formwork, it’s a concrete shuttering system which utilises highly Insulative materials which remain part of the concrete walls. The Concrete forwork is reinforced with steel rebar and shuttering insulation held to the front and back with wall ties.

Pool ready for concrete!

After four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have been added. Final checks are made, the drawings are triple-checked and the braces are laser aligned. Everything is now ready for an early start the

Pool ready for concrete! Read More »

ICF Swimming pool shell is up in three days

The beauty of using insulated concrete form-work for constructing your pool is not only the thermal efficiencies and cost savings, but it’s quick, really quick!! The ICF blocks are lightweight and easy to handle, meaning one person could move an entire pool shell by hand to it’s location with ease. The wall ties are high

ICF Swimming pool shell is up in three days Read More »

Insulated Swimming Pool Build

Work has begun on an insulated swimming pool build at a private residence close to Warrington. The indoor pool will be 11m x 5m when complete and will feature an automated slatted cover which will be housed behind a hidden wall. The pool will include LED under water lighting and pool side water feature fountains

Insulated Swimming Pool Build Read More »

New Build Outdoor Pool

Quadlock Infinity Edge

Work has begun on a new build outdoor pool in the the Chilterns near High Wycombe. The swimming pool has been designed by liaising direct with the clients and the initial pool slab has been constructed by local contractors using the drawings and structural calks provided by Brookforge. The reinforced concrete slab had a 5

New Build Outdoor Pool Read More »

Scroll to Top