Brookforge Swimming Pool Build

ICF Pool shell completed ready for installation of Pipework and fittings

The ICF pool shell and steelwork has flown up quickly and the temporary strong backs are tied into the wall. Now all thats needed is the installation of the pool shell fittings and there relevant pipe work before bracing ready for the concrete pour.

author avatar
Pool Build
Scroll to Top