New build basement swimming pool

Digging a basement pool hallSite excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down to a deep end water depth of 2m.

The pool will be a skimmer pool with a 150mm free-board to the surround floor tiles, it will also benefit from a remotely controlled hidden thermal slatted cover.

The pool hall will be built from scratch and will be located below an existing garden.

Working closely with the architects and mira construction, Brookforge will be designing, building, tanking, tiling and piping up everything pool related.

The plant room and all the associated equipment will be installed and tested by Brookforge as well as the pool hall air handling, dehumidification and ducting systems. Read More…

Hydrotherapy Spa Tiled, East Sussex

The tiling for the Hydrotherapy Spa has been finished, all that remains are the finishing touches to complete the surround. The spa comprises four separate seats and an air massage bed in the middle. There are both air and water jets, and color changing lights that contribute to the sensory experience.

If you are interested in having a Hydrotherapy Spa constructed, why not get in touch here to discuss your options.