Brookforge Swimming Pool Build

Basement swimming pool goes in first.

A basement swimming pool has started construction in Cheltenham. By working with the architect and contractors we can install a bespoke basement pool before the house itself is constructed. This way is always preferable rather than building a basement pool retrospectively, which always comes with logistical issues. Within two weeks the pool should be ready for the final concrete pore allowing the contractor to continue building the rest of the house around it.

author avatar
Pool Build
Scroll to Top