Brookforge Swimming Pool Build

onsite

Pool Balance Tank and Steps Constructed using ICF

Swimming pool balance tank & steps constructed using quadlock ICF. By constructing the swimming pool balance tank using ICF, we ensure that the balance tank has the same level of insulation as the rest of the Pool shell. Not only can we construct the swimming pool walls out of quad lock, we can also use […]

Pool Balance Tank and Steps Constructed using ICF Read More »

Concrete Poured, Pershore

ICF Swimming Pool Build post concrete pour

Concrete Pour Successful The pool shell is cast in a single pour, a homogeneous structure is far stronger than a traditional concrete block construction. The difference in level is to accommodate a cover which is hidden in a ‘pit’. The cover is an insulated slatted design, and features an automatic system which can be controlled

Concrete Poured, Pershore Read More »

Pool Pipework Installation for School Pool

Commercial Plantroom

Brookforge can offer assistance an expertise for Pool Pipework Installation and the associated plant room equipment and hydraulics when working alongside all of your contractors. That was certainly the case with a recent project in north London. The client was a small Primary school, who elected a contractor of choice to construct both pool and pool

Pool Pipework Installation for School Pool Read More »

New Deck Level Pool Project, Pershore

Insulated swimming pool shell construction

New Deck Level Pool Project The pool will be ‘deck level’, meaning the water will be the same height as the floor in the new building. A slot between the tiles around the perimeter will receive overflowing water. The pool features an insulated slatted cover, which is housed in a pit at one end of

New Deck Level Pool Project, Pershore Read More »

Pool Shell Construction & Concrete Pour

Basement swimming pool during construction

Basement Level Pool Shell Construction The pool structure comprises three walls at 1.4m, with the fourth wall at full ceiling height; supporting the concrete floor above. The cover will be housed in a ‘cave’ formed by a cantilever lid. This lid is tied in and cast with the walls. The pool features two stainless steel

Pool Shell Construction & Concrete Pour Read More »

Plant Room Pipework Installation, New Forest

swimming pool plant room pipe work

Plant Room Pipework Installation Plant room pipework is installed before the floor is screeded. The first stages of a plant room installation revolves around the placement of the suctions and return pipes. At Brookforge we believe that every stage of the plant room installation must be planned in advance to ensure ample spacing is left

Plant Room Pipework Installation, New Forest Read More »