Latest News

Pool Shell Construction & Concrete Pour
Basement Level Pool Shell Construction The pool structure comprises three walls at 1.4m, with the fourth wall at full ceiling height; supporting the concrete floor above. The cover will be housed in a ‘cave’ formed by a cantilever lid. This

Plant Room Pipework Installation, New Forest
Plant Room Pipework Installation Plant room pipework is installed before the floor is screeded. The first stages of a plant room installation revolves around the placement of the suctions and return pipes. At Brookforge we believe that every stage of

Pool Prepared for Screed & Rendering
Stainless steel mesh is fixed to all internal faces to allow rendering. The slab is insulated prior to screeding.
New Basement Pool Project, London: Slab Installation
[slideshow id=27] Reinforced concrete slab designed to withstand the force of a large volume of water. The following day, construction of the pool shell can begin. It doesn’t take long before the shape of the final product emerges. [12-1129]

Successful Pool Concrete Pour – Romsey
With the Quad-Lock structure supported, the central void is filled with concrete forming the pool shell, balance tank and steps. For more information regarding new builds or renovations, please contact the office on 01242 573572 or alternatively email [email protected]
Starter Bars Fixed, Construction of Structure Begins, Romsey
[slideshow id=26] The Romsey project is making good progress. The starter bars have been fixed to the slab, and the construction of the pool and balance tanks walls has begun using the Quad-Lock system. For more information about swimming pool