Pool Structure Complete
Its the six day on site and the pool structure is complete. After a successful concrete pour the previous day the walls are solid and we can start to remove
PoolBuild Journal
News, inspiration and insights from the world of bespoke swimming pools.

Its the six day on site and the pool structure is complete. After a successful concrete pour the previous day the walls are solid and we can start to remove

It’s the fifth day on the new pool build and we’re ready for concrete! The insulated concrete form-work we use for our swimming pool shells requires the concrete to be

After four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have

The beauty of using insulated concrete form-work for constructing your pool is not only the thermal efficiencies and cost savings, but it’s quick, really quick!! The ICF blocks are lightweight

Work has begun on an insulated swimming pool build at a private residence close to Warrington. The indoor pool will be 11m x 5m when complete and will feature an