Brookforge Swimming Pool Build

Latest News

Digging a basement pool hall
Basement
Pool Build
New build basement swimming pool

Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down

Read More »
Domestic Pools
Pool Build
Poolside steam room.

A poolside steam room located at the end of a new build basement swimming pool in London. A steam room is popular addition to many of the new build swimming pools which we are involved with and can be made

Read More »
School Overflow Pool
Commercial Pools
Pool Build
School overflow pool commissioned

A new build school overflow pool has been commissioned by Brookforge Poolbuild engineers. Working along side the council architects and builders, Brookforge helped with the design and build on this unique school pool. As well the design of the pool

Read More »
Outdoor slotted overflow swimming pool
Completed Pools
Pool Build
Commissioning Outdoor Overflow Pool

An outdoor overflow pool is in the final stages of commissioning with the testing and calibrating of its thermal slatted cover. Down on the south coast of England this pool was designed to be built using the Quadlock ICF system.

Read More »
Scroll to Top