
New build basement swimming pool
Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser
PoolBuild Journal
News, inspiration and insights from the world of bespoke swimming pools.

Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser

A recently completed project in Worcestershire was a new build fully insulated deck level pool. It benefited from the latest energy saving technology in the automated plant-room and a remote controlled

A poolside steam room located at the end of a new build basement swimming pool in London. A steam room is popular addition to many of the new build swimming

A new build school overflow pool has been commissioned by Brookforge Poolbuild engineers. Working along side the council architects and builders, Brookforge helped with the design and build on this

An outdoor overflow pool is in the final stages of commissioning with the testing and calibrating of its thermal slatted cover. Down on the south coast of England this pool

Spray tanking swimming pool shells ensures a perfect water tight swimming pool. The specialist tanking system is applied over several days and given several coats with each coat being fully