Brookforge Swimming Pool Build

Work in progress

Latest pictures from sites which are in progress

Braced and ready for CONCRETE!!

Our old friends at C & G Concrete Pumping are always the preferred experts to pump the concrete for all our localish pool shells. They now have the ability to mix the concrete whilst its being pumped in real time. This allows us to get the perfect mix removing any of the problems associated with […]

Braced and ready for CONCRETE!! Read More »

Case Study 21-750, Domestic, ICF, Insulated, Outdoor, Skimmer, Swimming Pool, Work in progress

ICF Pool Walls nearly completed

Day 3 and the ICF swimming pool walls are nearly complete. The steel reinforcement is complete and the pool shell is ready for the suctions, returns, lights and vacuum point to be installed and piped up.

ICF Pool Walls nearly completed Read More »

Case Study 21-750, Domestic, ICF, Insulated, Outdoor, Skimmer, Swimming Pool, Work in progress

Work begins on 15m outdoor pool

Brookforge supplied drawings for the ground workers to install a re-inforced concrete slab. Now work can begin on the building the ICF Quadlock Walls. The initial shape and size of the pool is laid out before it has galvanised track added to be tied into the slab, reinforced vertical steelwork is then installed into the

Work begins on 15m outdoor pool Read More »

Case Study 21-750, Domestic, Featured, ICF, Insulated, Outdoor, Skimmer, Swimming Pool, Work in progress

Plant room manifolds installed at the early stages of construction.

Swimming pool plant room manifolds

Just as it’s easier for us to build a pool in a basement before a house is constructed above it, it’s also a lot easier to start an install of a swimming pool plant room at its earliest stages. At a new pool build in South Cerney we were able to install the main plant

Plant room manifolds installed at the early stages of construction. Read More »

Domestic, Plant Room, Skimmer, Swimming Pool, Work in progress

Hill top swimming pool shell construction begins

Quadlock pool shell construction

The beauty of using Quadlock ICF for swimming pool shell construction is it’s very easy to get to site no matter how difficult the location. On-top of a rather large hill, on a slab constructed by groundwork’s team a week earlier, the basic pool shell flies up within a matter of days.

Hill top swimming pool shell construction begins Read More »

Case Study 19-800, Domestic, ICF, Indoor, Insulated, Swimming Pool, Work in progress,

Carbon neutral pool for an open water swimmer

ICF pool construction

With technological advances in solar/heat pump/ICF/insulation and automation, carbon neutral pools are potentially going to become a reality.

Carbon neutral pool for an open water swimmer Read More »

Case Study 19-500, Domestic, Energy Efficient, ICF, Insulated, Outdoor, Portfolio, Swimming Pool, Work in progress

Insulated Swimming Pool Build

Work has begun on an insulated swimming pool build at a private residence close to Warrington. The indoor pool will be 11m x 5m when complete and will feature an automated slatted cover which will be housed behind a hidden wall. The pool will include LED under water lighting and pool side water feature fountains

Insulated Swimming Pool Build Read More »

ICF, Indoor, Steam Room, Swimming Pool, Work in progress, , , , ,

New Build Outdoor Pool

Quadlock Infinity Edge

Work has begun on a new build outdoor pool in the the Chilterns near High Wycombe. The swimming pool has been designed by liaising direct with the clients and the initial pool slab has been constructed by local contractors using the drawings and structural calks provided by Brookforge. The reinforced concrete slab had a 5

New Build Outdoor Pool Read More »

Domestic, ICF, Infinity, Outdoor, Swimming Pool, Work in progress, , , , , , , , ,