Swimming pool wall bracing.

Pool wall bracing

Pool wall bracingThis is the third update for the underground basement swimming pool which is being constructed in Wimbledon, London. The quadlock swimming pool wall have now been finished with all the associated reinforcing steelwork secured.

Once the Quad lock ICF wall has been has been constructed, aluminum strong backs are fixed to the wall and then braced to the pool slab. This is to ensure there is no movement when the concrete is poured into the wall cavity.

All the pool shell fittings, associated pipe runs and wall conduits are also installed at this time. Skimmer boxes, low level suctions, vacuum points and underwater lights are easily mounted in the quadlock wall using a hot wire gun and core drills.

At the shallow end of the pool a shuttered cave lid is built and braced to house the automatic slatted pool cover which will be hidden behind a false wall.

Pool wall strong backs  bracing02  Skimmer box mounted in wall  Pool wall bracing  Paul wall bracing  Cover cave lid bracing  Cover cave lid bracing  Cover cave lid shuttering  Pool wall bracing begins

As the project progresses, we will be posting regular updates so you can follow the pool build project progress by clicking the project number: 14-591.