Brookforge Swimming Pool Build

quad lock

Pool Shell Tanked, New Forest

Swimming pool after first application of waterproof tanking

With the pool shell now waterproof, tiling can begin. The tanking membrane is a premium, flexible product which can withstand water pressure up to 3 Bar. The product is available directly from us, call on 01242 573572 to find out more or place an order. [12-150]

Pool Shell Tanked, New Forest Read More »

Pool Steps Poured, New Forest

Concrete Poured The concrete for six pool steps is poured. Each step is reinforced and tied to the base, ensuring no movement and increasing tensile strength. The steps house water inlets and underwater LED lights. Due to the modular construction type of Quad-Lock, any design requirements of steps and other elements, are easily achievable. Stainless

Pool Steps Poured, New Forest Read More »

Hydrotherapy Spa Completed

Hydrotherapy Massage bench

Hydrotherapy Spa Completion A New Hydrotherapy Spa has been completed a school for children with disabilities and is now fully up and running. This hydrotherapy spa was constructed using the Quadlock ICF system so the shell was highly insulated and kept heat losses are kept to a minimum. As the Spa had a beach area with grill covered

Hydrotherapy Spa Completed Read More »

Concrete Poured, Moreton in Marsh

Concrete Poured Successfully This project comprises of a large spa bath, uniquely shaped deck level pool and balance tanks for each. The pool will have an insulated slatted cover which will be hidden when closed. Colour changing LED lights will be used to light up the water. These are controllable and compatible with automation systems.

Concrete Poured, Moreton in Marsh Read More »

Hydrotherapy Spa Rendered, East Sussex

Hydrotherapy Spa Rendered Using specialist products, which can be found on our Pool Construction Products, the Quad-Lock shell is rendered prior to tanking. The bench in the middle is an air massage bed, which will be both sensory and relaxing for its users at this specialist school for children with disabilities.

Hydrotherapy Spa Rendered, East Sussex Read More »

Concrete Poured – Hydrotherapy Spa, East Sussex

overflow spa after concrete poured into ICF

Concrete Pour Complete Because the structures are unified, both the balance tank and hydrotherapy pool are poured as one. This ensures a homogeneous mix without the risk of cracking which can occur when two mixes are poured at different intervals. The concrete will be allowed to cure before the removal of supports, the project will

Concrete Poured – Hydrotherapy Spa, East Sussex Read More »

Quad-Lock Construction Complete for Hydrotherapy Spa Pool, East Sussex

The Quad-Lock shell for both spa pool and balance tank is nearly complete. A twin wall of insulation provides a substantial reduction in heat loss. The balance tank and spa shell are a homogenous structure, the union of the two elements adds rigidity and strength to both.

Quad-Lock Construction Complete for Hydrotherapy Spa Pool, East Sussex Read More »

Setting Out Hydrotherapy Pool, East Sussex

Setting out hydrotherapy spa walls

Brookforge have undertaken a new project at a school which educates children with disabilities. We are constructing a specialist hydrotherapy pool which will be both stimulating and relaxing for its users; the older children. The pool will include a series of lights and jets, and will feature an air massage bed. For more information on

Setting Out Hydrotherapy Pool, East Sussex Read More »