Brookforge Swimming Pool Build

quad lock

Commissioning Outdoor Overflow Pool

Outdoor slotted overflow swimming pool

An outdoor overflow pool is in the final stages of commissioning with the testing and calibrating of its thermal slatted cover. Down on the south coast of England this pool was designed to be built using the Quadlock ICF system. Using an ICF system means the pool is highly insulated and the addition of a […]

Commissioning Outdoor Overflow Pool Read More »

Concrete Poured, Pershore

ICF Swimming Pool Build post concrete pour

Concrete Pour Successful The pool shell is cast in a single pour, a homogeneous structure is far stronger than a traditional concrete block construction. The difference in level is to accommodate a cover which is hidden in a ‘pit’. The cover is an insulated slatted design, and features an automatic system which can be controlled

Concrete Poured, Pershore Read More »

Pool Shell Construction & Concrete Pour

Basement swimming pool during construction

Basement Level Pool Shell Construction The pool structure comprises three walls at 1.4m, with the fourth wall at full ceiling height; supporting the concrete floor above. The cover will be housed in a ‘cave’ formed by a cantilever lid. This lid is tied in and cast with the walls. The pool features two stainless steel

Pool Shell Construction & Concrete Pour Read More »

New Basement Pool Project, London: Slab Installation

[slideshow id=27] Reinforced concrete slab designed to withstand the force of a large volume of water. The following day, construction of the pool shell can begin. It doesn’t take long before the shape of the final product emerges. [12-1129]

New Basement Pool Project, London: Slab Installation Read More »

Starter Bars Fixed, Construction of Structure Begins, Romsey

[slideshow id=26] The Romsey project is making good progress. The starter bars have been fixed to the slab, and the construction of the pool and balance tanks walls has begun using the Quad-Lock system. For more information about swimming pool construction using Quad-Lock, click here; alternatively contact us on 01242 573572.

Starter Bars Fixed, Construction of Structure Begins, Romsey Read More »

Pool Slab Poured, Romsey

[slideshow id=25] We have just started a new project near Romsey, Hampshire. We are constructing an ICF pool inside the existing liner pool shell. The Shell, however, cannot be relied on structurally. Therefore we are treating this project as a new build, requiring a reinforced concrete base for the Quad-Lock structure.

Pool Slab Poured, Romsey Read More »

Scroll to Top