Brookforge Swimming Pool Build

Swimming Pool

A selection of recently completed and ongoing Brookforge Pool Build Projects

ICF Pool shell completed ready for installation of Pipework and fittings

The ICF pool shell and steelwork has flown up quickly and the temporary strong backs are tied into the wall. Now all thats needed is the installation of the pool shell fittings and there relevant pipe work before bracing ready for the concrete pour.

ICF Pool shell completed ready for installation of Pipework and fittings Read More »

Case Study 19-500, ICF, Swimming Pool

Carbon neutral pool for an open water swimmer

ICF pool construction

With technological advances in solar/heat pump/ICF/insulation and automation, carbon neutral pools are potentially going to become a reality.

Carbon neutral pool for an open water swimmer Read More »

Case Study 19-500, Domestic, Energy Efficient, ICF, Insulated, Outdoor, Portfolio, Swimming Pool, Work in progress

Outdoor Pool Refurbishment

Brookforge refurbished this outdoor pool in North London. We added a Covrex automatic cover, complete with underwater skimmer system that allows the pool to have a high freeboard giving the pool the look of an overflow pool without all of the cost. We laid Natural Stone slabs to create a modern looking surround that extended

Outdoor Pool Refurbishment Read More »

Swimming Pool,

Pool Design Service

WB Design & Build were carrying out a full refurbishment of an old rectory in Wiltshire and asked Brookforge to design a 15m x 5m outdoor pool. We provided a complete pool and plantroom design along with supply and installation of the specialist equipment such as the Covrex Slatted Automatic cover and the Pentair Intellipool

Pool Design Service Read More »

Swimming Pool, , ,

Infinity Overflow Pool in Sand Banks

each side swimming pool

The construction of an infinity overflow pool has been completed down on the south coast in Bournemouth. The beach side pool has spectacular views across pool harbor and was part of a new build luxury development in Sand Banks. The Infinity pool also benefited from a Binder Water turbine which creates a wide natural river

Infinity Overflow Pool in Sand Banks Read More »

Infinity, Insulated, Portfolio, , , , ,

Pool Structure Complete

Its the six day on site and the pool structure is complete. After a successful concrete pour the previous day the walls are solid and we can start to remove the bracing and shutter boards. Whilst the braces are being removed suction and return pipework is installed back to the plant room before the block

Pool Structure Complete Read More »

ICF, Swimming Pool, , , , ,
Scroll to Top