Brookforge Swimming Pool Build

ICF

New Basement Pool Project, London: Slab Installation

[slideshow id=27] Reinforced concrete slab designed to withstand the force of a large volume of water. The following day, construction of the pool shell can begin. It doesn’t take long before the shape of the final product emerges. [12-1129]

New Basement Pool Project, London: Slab Installation Read More »

Starter Bars Fixed, Construction of Structure Begins, Romsey

[slideshow id=26] The Romsey project is making good progress. The starter bars have been fixed to the slab, and the construction of the pool and balance tanks walls has begun using the Quad-Lock system. For more information about swimming pool construction using Quad-Lock, click here; alternatively contact us on 01242 573572.

Starter Bars Fixed, Construction of Structure Begins, Romsey Read More »

Pool Slab Poured, Romsey

[slideshow id=25] We have just started a new project near Romsey, Hampshire. We are constructing an ICF pool inside the existing liner pool shell. The Shell, however, cannot be relied on structurally. Therefore we are treating this project as a new build, requiring a reinforced concrete base for the Quad-Lock structure.

Pool Slab Poured, Romsey Read More »

Hydrotherapy Spa Completed

Hydrotherapy Massage bench

Hydrotherapy Spa Completion A New Hydrotherapy Spa has been completed a school for children with disabilities and is now fully up and running. This hydrotherapy spa was constructed using the Quadlock ICF system so the shell was highly insulated and kept heat losses are kept to a minimum. As the Spa had a beach area with grill covered

Hydrotherapy Spa Completed Read More »