It’s Concrete Time!! Cheltenham new build basement swimming pool
After just 2 weeks onsite constructing the ICF pool shell, the concrete has been successfully poured. Working alongside our regular favourite concrete pumper Kev, the entire pool shell was poured

New build basement ICF swimming pool braced and ready for concrete pour.

Basement swimming pool goes in first.
A basement swimming pool has started construction in Cheltenham. By working with the architect and contractors we can install a bespoke basement pool before the house itself is constructed. This

Stands the Test of Time…
A swimming pool which was completed back in 2014 still looks as impressive as the day it was first commissioned. The deck level overflow pool had a minor fault maintaining

ICF Pool shell completed ready for installation of Pipework and fittings
The ICF pool shell and steelwork has flown up quickly and the temporary strong backs are tied into the wall. Now all thats needed is the installation of the pool

Carbon neutral pool for an open water swimmer