Brookforge Swimming Pool Build

Sector

The sector which the pool fits into

Slatted thermal pool cover installed and tested in Pershore

A recently completed project in Worcestershire was a new build fully insulated deck level pool. It benefited from the latest energy saving technology in the automated plant-room and a remote controlled slatted thermal pool cover which is hidden away in the floor of the pool. Working directly with the Architect from first conception meant that everything […]

Slatted thermal pool cover installed and tested in Pershore Read More »

Completed Pools, Domestic Pools, Energy Efficient, Indoor, Insulated, Swimming Pool, , , , , ,

Poolside steam room.

A poolside steam room located at the end of a new build basement swimming pool in London. A steam room is popular addition to many of the new build swimming pools which we are involved with and can be made to fit in any available space. We can design and install and custom made steam

Poolside steam room. Read More »

Domestic Pools, Steam Room, Work in progress, ,

School overflow pool commissioned

School Overflow Pool

A new build school overflow pool has been commissioned by Brookforge Poolbuild engineers. Working along side the council architects and builders, Brookforge helped with the design and build on this unique school pool. As well the design of the pool structure, we specified and installed all the plant-room equipment to meet with all safety standards

School overflow pool commissioned Read More »

Commercial Pools, Completed Pools, Indoor, Overflow/Deck Level, Swimming Pool, , ,

Commissioning Outdoor Overflow Pool

Outdoor slotted overflow swimming pool

An outdoor overflow pool is in the final stages of commissioning with the testing and calibrating of its thermal slatted cover. Down on the south coast of England this pool was designed to be built using the Quadlock ICF system. Using an ICF system means the pool is highly insulated and the addition of a

Commissioning Outdoor Overflow Pool Read More »

Completed Pools, Domestic Pools, Outdoor, Overflow/Deck Level, Portfolio, Swimming Pool, , , , , , , , ,

Pool Pipework Installation for School Pool

Commercial Plantroom

Brookforge can offer assistance an expertise for Pool Pipework Installation and the associated plant room equipment and hydraulics when working alongside all of your contractors. That was certainly the case with a recent project in north London. The client was a small Primary school, who elected a contractor of choice to construct both pool and pool

Pool Pipework Installation for School Pool Read More »

Commercial Pools, Plant Room, Speciality, Swimming Pool, , , , , ,

New Deck Level Pool Project, Pershore

Insulated swimming pool shell construction

New Deck Level Pool Project The pool will be ‘deck level’, meaning the water will be the same height as the floor in the new building. A slot between the tiles around the perimeter will receive overflowing water. The pool features an insulated slatted cover, which is housed in a pit at one end of

New Deck Level Pool Project, Pershore Read More »

Domestic Pools, ICF, Indoor, Overflow/Deck Level, Swimming Pool, , , , ,

Pool Shell Construction & Concrete Pour

Basement swimming pool during construction

Basement Level Pool Shell Construction The pool structure comprises three walls at 1.4m, with the fourth wall at full ceiling height; supporting the concrete floor above. The cover will be housed in a ‘cave’ formed by a cantilever lid. This lid is tied in and cast with the walls. The pool features two stainless steel

Pool Shell Construction & Concrete Pour Read More »

Basement, Domestic Pools, Indoor, Insulated, Skimmer, Swimming Pool, , , , ,

Plant Room Pipework Installation, New Forest

swimming pool plant room pipe work

Plant Room Pipework Installation Plant room pipework is installed before the floor is screeded. The first stages of a plant room installation revolves around the placement of the suctions and return pipes. At Brookforge we believe that every stage of the plant room installation must be planned in advance to ensure ample spacing is left

Plant Room Pipework Installation, New Forest Read More »

Domestic Pools, Outdoor, Plant Room, Technical, , , , , , ,
Scroll to Top