Brookforge Swimming Pool Build

Pool Build

Basement swimming pool goes in first.

A basement swimming pool has started construction in Cheltenham. By working with the architect and contractors we can install a bespoke basement pool before the house itself is constructed. This way is always preferable rather than building a basement pool retrospectively, which always comes with logistical issues. Within two weeks the pool should be ready

Basement swimming pool goes in first. Read More »

ICF, Swimming Pool

Stands the Test of Time…

deck Level Overflow Slatted Cover Opening

A swimming pool which was completed back in 2014 still looks as impressive as the day it was first commissioned. The deck level overflow pool had a minor fault maintaining its water level, after closer inspection our engineers found a faulty solenoid on the besgo valve which maintains the balance tank levels. A quick fix

Stands the Test of Time… Read More »

Completed Pools, Domestic Pools, Energy Efficient, Indoor, Insulated, Overflow/Deck Level, Swimming Pool

Infinity Overflow Pool in Sand Banks

each side swimming pool

The construction of an infinity overflow pool has been completed down on the south coast in Bournemouth. The beach side pool has spectacular views across pool harbor and was part of a new build luxury development in Sand Banks. The Infinity pool also benefited from a Binder Water turbine which creates a wide natural river

Infinity Overflow Pool in Sand Banks Read More »

Infinity, Insulated, Portfolio, , , , ,
Scroll to Top