Work begins for the pool wall construction on a twin depth basement swimming pool in London. The walls are being constructed using the Quadlock Insulated Concrete Formwork (ICF) system and is being built on a reinforced slab installed by the existing site workers from Brookforge drawings.
The shallow water depth is 1.3m going down to a deep end water depth of 2m and the pool will be a skimmer pool with a 150mm freeboard to the surround floor tiles.