Brookforge Swimming Pool Build

Culcheth Pool Commissioned

steam room pool view

Working alongside the clients’ architect, a luxury new build swimming pool has been completed close to the city of Warrington. The pool hall includes a fully insulated swimming pool, beautiful water features, steam room and sauna, all expertly constructed by Brookforge. In addition Brookforge installed a fully automated plant room and air handling systems to

Culcheth Pool Commissioned Read More »

Basement swimming pool goes in first.

A basement swimming pool has started construction in Cheltenham. By working with the architect and contractors we can install a bespoke basement pool before the house itself is constructed. This way is always preferable rather than building a basement pool retrospectively, which always comes with logistical issues. Within two weeks the pool should be ready

Basement swimming pool goes in first. Read More »

Stands the Test of Time…

deck Level Overflow Slatted Cover Opening

A swimming pool which was completed back in 2014 still looks as impressive as the day it was first commissioned. The deck level overflow pool had a minor fault maintaining its water level, after closer inspection our engineers found a faulty solenoid on the besgo valve which maintains the balance tank levels. A quick fix

Stands the Test of Time… Read More »

Scroll to Top