Brookforge Swimming Pool Build

A Perfect Pour

This concrete pour couldn’t have really gone any better, C & G were awesome and gave us complete control of the rate the concrete entered the ICF shell.

Due to the real time concrete mix there was no wastage and the perfect consistency. Once the concrete pour was complete, starter bars were added so that the pool shell can be tied into the pool surround at a later date once backfilled.

author avatar
Pool Build
Scroll to Top