Brookforge supplied drawings for the ground workers to install a re-inforced concrete slab. Now work can begin on the building the ICF Quadlock Walls. The initial shape and size of the pool is laid out before it has galvanised track added to be tied into the slab, reinforced vertical steelwork is then installed into the slab and horizontal steel added to each course.