Brookforge Swimming Pool Build

Domestic Pools

A private swimming pool should be a pleasure to use and straightforward to maintain. Pool Build refurbishes domestic swimming pools, helping homeowners update ageing finishes, improve equipment performance and create more comfortable, efficient spaces.

Our refurbishment work can include new liners or tiling, structural repairs, plant room upgrades, heating and filtration improvements, or a more extensive redesign. Every project is planned around the existing pool, the property and the owner’s priorities.

Explore our domestic swimming pool refurbishment projects.

Custom Tiled Spa Installation

A custom tiled spa has been delivered and installed at a new build swimming pool hall in the Midlands. With the help of some muscle from the other tradesmen on site the spa was slowly lowered into its final position. Once levelled and stabilised the spa is ready for piping up to the plant room

Custom Tiled Spa Installation Read More »

Domestic Pools, Indoor, Spa Bath, Speciality, Swimming Pool

Culcheth Pool Commissioned

steam room pool view

Working alongside the clients’ architect, a luxury new build swimming pool has been completed close to the city of Warrington. The pool hall includes a fully insulated swimming pool, beautiful water features, steam room and sauna, all expertly constructed by Brookforge. In addition Brookforge installed a fully automated plant room and air handling systems to

Culcheth Pool Commissioned Read More »

Completed Pools, Domestic Pools, Energy Efficient, Indoor, Insulated, Sauna, Steam Room, Swimming Pool, Water Features

Stands the Test of Time…

deck Level Overflow Slatted Cover Opening

A swimming pool which was completed back in 2014 still looks as impressive as the day it was first commissioned. The deck level overflow pool had a minor fault maintaining its water level, after closer inspection our engineers found a faulty solenoid on the besgo valve which maintains the balance tank levels. A quick fix

Stands the Test of Time… Read More »

Completed Pools, Domestic Pools, Energy Efficient, Indoor, Insulated, Overflow/Deck Level, Swimming Pool

Concrete Day!

It’s the fifth day on the new pool build and we’re ready for concrete! The insulated concrete form-work we use for our swimming pool shells requires the concrete to be pumped in (via a concrete pump) in a loose liquid form. Usually pumped via a long boom it means we can reach even the hardest

Concrete Day! Read More »

Domestic Pools, ICF, Insulated, Swimming Pool, , , , ,

Pool ready for concrete!

After four days on site the insulated concrete form-work is up and braced. The pipework and conduits through the shell are in position and any shuttering for fixing points have been added. Final checks are made, the drawings are triple-checked and the braces are laser aligned. Everything is now ready for an early start the

Pool ready for concrete! Read More »

Domestic Pools, ICF, Indoor, Insulated, Skimmer, Swimming Pool, , ,

ICF Swimming pool shell is up in three days

The beauty of using insulated concrete form-work for constructing your pool is not only the thermal efficiencies and cost savings, but it’s quick, really quick!! The ICF blocks are lightweight and easy to handle, meaning one person could move an entire pool shell by hand to it’s location with ease. The wall ties are high

ICF Swimming pool shell is up in three days Read More »

Domestic Pools, ICF, Insulated, Swimming Pool, , ,
Scroll to Top