New Build Outdoor Pool

New Build Outdoor Pool

New Build Outdoor Pool Construction

Work has begun on a new build outdoor pool in the the Chilterns near High Wycombe. The swimming pool has been designed by liaising direct with the clients and the initial pool slab has been constructed by local contractors using the drawings and structural calks provided by Brookforge.

The reinforced concrete slab had a 5 days to cure before we could start on the construction of the pool walls at the start of this week. The initial pool shape was marked and had track for the walls cut to size. The Quadlock walls are then constructed in the track and the size and feel of the pool begins to take shape. Once the first course is complete the pool position, location and proportions are double checked and squared up. Now the pool location is finalized the pool wall vertical steal are drilled and anchored into the pool slab and the next courses can fly up within the space of 2 days. Read More…

New design outdoor pool completed

design outdoor pool

A new design outdoor pool has been completed by our in house designers.

Working directly with the customers; our project manager has finalized the designs for this unique pool.

This bespoke swimming pool is ready to go from paper drawings to being constructed onsite over the next 3 weeks.

The pool will be constructed using the Quadlock insulated concrete form-work and will be carried out by our in house team of pool builders. The initial groundwork’s and pool slab has been completed by the customer’s landscaper by following the installation drawings provided by our designers and structural engineer. Read More…