New build swimming pool with metal overflow

New Build Swimming Pool With Metal Overflow Grating PoolA new build swimming pool constructed near Romsey. The overflow swimming pool was built using the quadlock ICF system. Using insulated concrete form-work (ICF) ensures that the pool is highly insulated and structurally solid.

The new build swimming pool benefited from luxury stainless steel parallel grating tiles , the grating tiles are designed to be extra wide ensure the pool surround area is kept dry. The balance tank was directly below the overflow and the water entered the tank via shoot to minimize any unwanted water noises.

To ensure the balance tank was hard wearing, easy to maintain and water tight it was fiber glassed onsite.

Read More…

Pool Balance Tank and Steps Constructed using ICF

Pool Balance Tank and steps using ICF
Swimming pool balance tank & steps constructed using quadlock ICF.

By constructing the swimming pool balance tank using ICF, we ensure that the balance tank has the same level of insulation as the rest of the Pool shell.

Not only can we construct the swimming pool walls out of quad lock, we can also use the system to form custom swimming pool steps. By constructing the steps out of ICF it enables us to pass fittings through. Inlets, lights and massage jets can be added to make a feature out of the steps and a great place for bathers to sit and relax.

 

London Basement Swimming Pool and Steam Room

London basement swimming pool and steam roomThis London basement swimming pool and steam room project was a luxury design & build project which was first planned way back at the end of 2013.

The project required a pool, a steam room, a fully automated plant room and pool hall air handling system which would maintain a pleasant environment in the basement of an existing property.

This project was in the very popular Downshire Hill area just off Hampstead Heath in London.

As with almost all London projects site access was an issue, working with James Taylor Construction ensured site safety had to be kept at a premium and the project has reached completion within specified time frames.

The finishes specified by the architects where to a very high standard, resulting in very unique and eye catching pool hall, swimming pool and steam room.

Read More…