New Forest: Concrete Pour

reinforced concrete pool lid being poured

Today we have successfully poured 52 cubic metres of concrete to form the walls, balance tanks and cover lid. As this post goes live, the concrete is curing; resisting the low temperatures with double sided insulation. This stage is a key development within the project and could not be achieved so quickly with alternative pool […]

New Forest: Concrete Pour Read More »

Domestic, Energy Efficient, Insulated, Outdoor, Overflow/Deck Level, Swimming Pool, Work in progress, , , , , , , ,

New Forest: Pool Braced for Concrete Pour

swimming pool shell braced ready for concrete

Quad-Lock is one of the more adaptable ICF systems, which enables alterations in the design to accommodate features such as steps, overflow channels, cover pits and balance tanks. To find out more about hidden cover options see here for further details. For any questions regarding ICF construction please get in touch here. [12-150]

New Forest: Pool Braced for Concrete Pour Read More »

Domestic, Energy Efficient, Insulated, Outdoor, Overflow/Deck Level, Swimming Pool, Work in progress, , , ,

360 View of New Forest Site

Click here to see a 360 view of your new site in Hampshire. We will update the blog with more 360 shots as the build develops. [12-150]

360 View of New Forest Site Read More »

Domestic, Energy Efficient, Insulated, Outdoor, Overflow/Deck Level, Swimming Pool, Work in progress, , , ,

New Forest: New Insulated Pool Build

ICF pool walls being set out

A new insulated outdoor pool project in Hampshire, using the Quad-Lock ICF (Insulating Concrete Form-work) system. Brookforge have pioneered the use of Quad-Lock in swimming pool construction and with Quad-Lock being so flexible, it is our ICF of choice. To read more about the Quad-Lock system read here. Setting out is a critical stage of the

New Forest: New Insulated Pool Build Read More »

Domestic, Energy Efficient, Insulated, Outdoor, Overflow/Deck Level, Swimming Pool, Work in progress, , ,

External Ductwork Southampton

Pool Hall Ductwork external

  The newly built pool hall requires a fairly extensive air handling system to cope with the amount of glazing. Brookforge can design, supply and install the entire system with bespoke options to suit your needs. Contacts us here for a quote.

External Ductwork Southampton Read More »

Domestic, Energy Efficient, Refurbishment, Swimming Pool, Work in progress, , , ,

22m Child friendly play pool West Yorkshire

The client is extending a refurbishing large period dwelling to become a 52 bedroomed residence for friends and family. When the client’s project manager went on holiday days before a concrete pour and pool materials had not been ordered, the client turned to Brookforge for help

22m Child friendly play pool West Yorkshire Read More »

Completed Pools, Domestic, Energy Efficient, Indoor, Insulated, Refurbishment, Skimmer, Spa Bath, Water Features, Work in progress