Brookforge Swimming Pool Build

Swimming Pool

A selection of recently completed and ongoing Brookforge Pool Build Projects

Another Pool Build Project Begins

Brookforge PoolBuild Van

With new pool build projects starting on a regular basis we are used to working in many different environments; be it basements in London to cliff edges in Italy. Our latest pool build project is at a breathtaking location on top of a hill overlooking the Worcestershire and the Malvern hills. Being on top of […]

Another Pool Build Project Begins Read More »

Case Study 19-800, Swimming Pool

Custom Tiled Spa Installation

A custom tiled spa has been delivered and installed at a new build swimming pool hall in the Midlands. With the help of some muscle from the other tradesmen on site the spa was slowly lowered into its final position. Once levelled and stabilised the spa is ready for piping up to the plant room

Custom Tiled Spa Installation Read More »

Domestic, Indoor, Spa Bath, Speciality, Swimming Pool

Culcheth Pool Commissioned

steam room pool view

Working alongside the clients’ architect, a luxury new build swimming pool has been completed close to the city of Warrington. The pool hall includes a fully insulated swimming pool, beautiful water features, steam room and sauna, all expertly constructed by Brookforge. In addition Brookforge installed a fully automated plant room and air handling systems to

Culcheth Pool Commissioned Read More »

Completed Pools, Domestic, Energy Efficient, Indoor, Insulated, Sauna, Steam Room, Swimming Pool, Water Features

Basement swimming pool goes in first.

A basement swimming pool has started construction in Cheltenham. By working with the architect and contractors we can install a bespoke basement pool before the house itself is constructed. This way is always preferable rather than building a basement pool retrospectively, which always comes with logistical issues. Within two weeks the pool should be ready

Basement swimming pool goes in first. Read More »

ICF, Swimming Pool

Stands the Test of Time…

deck Level Overflow Slatted Cover Opening

A swimming pool which was completed back in 2014 still looks as impressive as the day it was first commissioned. The deck level overflow pool had a minor fault maintaining its water level, after closer inspection our engineers found a faulty solenoid on the besgo valve which maintains the balance tank levels. A quick fix

Stands the Test of Time… Read More »

Completed Pools, Domestic, Energy Efficient, Indoor, Insulated, Overflow/Deck Level, Swimming Pool
Scroll to Top