Brookforge Swimming Pool Build

Case Study 19-500

Built for a family serious about swimming this 16.09m pool was constructed on a farm in the heart of the Wiltshire countryside. The purpose of the atypical length is so that 100 lengths (1609m) is exactly 1 mile in distance (and 50 lengths will be half a mile).

ICF Pool shell completed ready for installation of Pipework and fittings

The ICF pool shell and steelwork has flown up quickly and the temporary strong backs are tied into the wall. Now all thats needed is the installation of the pool shell fittings and there relevant pipe work before bracing ready for the concrete pour.

ICF Pool shell completed ready for installation of Pipework and fittings Read More »

Case Study 19-500, ICF, Swimming Pool

Carbon neutral pool for an open water swimmer

ICF pool construction

With technological advances in solar/heat pump/ICF/insulation and automation, carbon neutral pools are potentially going to become a reality.

Carbon neutral pool for an open water swimmer Read More »

Case Study 19-500, Domestic, Energy Efficient, ICF, Insulated, Outdoor, Portfolio, Swimming Pool, Work in progress
Scroll to Top