[singlepic id=303 w=480 h=360 float=left]
The tiles in the pool have been laid and the grout is curing. The cover pit lids are in place and
are ready to receive the surround tiles. The next step to be completed is the stretched ceiling in
the cavity pictured above. To find out more about stretched ceilings click here.