Brookforge Swimming Pool Build

22-200

Slatted Cover Installation Wimbledon

Basement Swimming Pool Covered

With the pool successfully filled and the plantroom fully running, heating, treating and filtering the pools water; its time to install the insulated slatted cover. The motorised slatted cover prevents heat losses and any evaporation of the pool water at the same time preventing debris entering the pool water. The remote controlled automatic reel system […]

Slatted Cover Installation Wimbledon Read More »

Basement, Completed Pools, Domestic, Skimmer, Slatted Cover, Swimming Pool, Work in progress, , , , ,

Pool Shell Tiled Wimbledon

A basement swimming pool has been tiled, grouted and all the stainless steel pool shell fittings installed. Once the new grout has fully cured; the process of filling the pool can gradually start. With the pool is full of water we can begin testing the plantroom equipment to ensure the pool circulation is functioning correctly.

Pool Shell Tiled Wimbledon Read More »

Basement, Domestic, Indoor, Insulated, Swimming Pool, Tiling, Work in progress, , , , ,

Ductwork installed Wimbledon

Final installation of a custom air handling system for a new build development in a Wimbledon basement. The ductwork has been custom designed for the maximum efficiency of air flow though the pool hall, removing moist stale air and replacing it with warm dry air to all areas of the pool hall especially glazing and

Ductwork installed Wimbledon Read More »

Air Handling (Ductwork), Basement, Domestic, Plant Room, Swimming Pool, Work in progress, , , , ,

Concrete Poured Wimbledon

Another successful concrete pour for a new build development in a Wimbledon basement. The ICF swimming pool system allows the pool shell can be constructed relatively quickly and have any final adjustments made should there be onsite issues. All the pool shell fittings are cast within the pool shell concrete which is vibrated to ensure

Concrete Poured Wimbledon Read More »

Basement, Domestic, Swimming Pool, Work in progress, , , ,

ICF basement pool shell ready for concrete.

Quadlock Pool Shell

A quadlock pool shell has been assembled and braced in accordance with the installation pack; We are now ready for the concrete pour the following day, so time for a few final checks that the access is ready. Due to its lightweight nature and easy handling, the quad lock system is highly suited to hard

ICF basement pool shell ready for concrete. Read More »

Basement, Domestic, ICF, Swimming Pool, Work in progress, , , ,

Basement Swimming Pool Begins

“‘The early bird catches the Worm” Its an old saying but is very true when constructing swimming pools. Being onsite ahead of schedule for the building a new basement swimming pool in Wimbledon; we were able to install all the pipe runs and sevices required to connect the pool through to the plant room. By

Basement Swimming Pool Begins Read More »

Basement, Domestic, ICF, Pipework, Skimmer, Swimming Pool, Work in progress, , ,