Swimming Pool and Steam Room Refurbishment in Hertfordshire
This Hertfordshire project involved refurbishing a classically designed indoor swimming pool and upgrading associated steam room equipment.
Pool Refurbishment and Mosaic Tiling
The pool shell was re-tiled with Bisazza mosaic tiles. New polished stainless steel fittings, a counter-current swim unit and colour-changing LED lighting were installed.
Filtration and Water Treatment Upgrades
Brookforge provided design and consultancy covering the pool shell, filtration, disinfection and plant room equipment. The project included an ozone treatment system with de-gas unit, semi-automatic chlorine and pH dosing and automatic filter backwashing.
Air Handling and Steam Room Equipment
The scope also included specification and supply of a ducted air-handling unit and steam room equipment.
Modernising an Existing Swimming Pool
This project combined visual improvements with upgrades to the systems supporting the pool and steam room. Contact Pool Build about an existing swimming pool refurbishment.
Project reference: 9-382