Brookforge Swimming Pool Build

Project Type

Type of Project

Slatted Cover Installation Wimbledon

Basement Swimming Pool Covered

With the pool successfully filled and the plantroom fully running, heating, treating and filtering the pools water; its time to install the insulated slatted cover. The motorised slatted cover prevents heat losses and any evaporation of the pool water at the same time preventing debris entering the pool water. The remote controlled automatic reel system […]

Slatted Cover Installation Wimbledon Read More »

Basement, Completed Pools, Domestic, Skimmer, Slatted Cover, Swimming Pool, Work in progress, , , , ,

Pool Shell Tiled Wimbledon

A basement swimming pool has been tiled, grouted and all the stainless steel pool shell fittings installed. Once the new grout has fully cured; the process of filling the pool can gradually start. With the pool is full of water we can begin testing the plantroom equipment to ensure the pool circulation is functioning correctly.

Pool Shell Tiled Wimbledon Read More »

Basement, Domestic, Indoor, Insulated, Swimming Pool, Tiling, Work in progress, , , , ,

Concrete pour in Warwickshire

Another successsfull concrete pour completed with a high boom concrete pump. It was made easy by the excellent access on the site, this meant the concrete pump could get pretty close to the pool. The pump could then deliver the concrete from above straight into the ICF wall cavity will zero spills/waste. More updates to

Concrete pour in Warwickshire Read More »

Basement, Domestic, ICF, Indoor, Insulated, Swimming Pool, Work in progress

New pool build in Warwickshire

An 11m x 5m indoor swimming pool has started to take shape within the first day onsite. The pool hall is being constructed at the same time as the pool on the same re-inforced concrete slab. The final leisure suite will also include a gym, sauna and associated changing rooms. The leisure suite will also

New pool build in Warwickshire Read More »

Basement, Domestic, ICF, Indoor, Insulated, Swimming Pool, Work in progress

Ductwork installed Wimbledon

Final installation of a custom air handling system for a new build development in a Wimbledon basement. The ductwork has been custom designed for the maximum efficiency of air flow though the pool hall, removing moist stale air and replacing it with warm dry air to all areas of the pool hall especially glazing and

Ductwork installed Wimbledon Read More »

Air Handling (Ductwork), Basement, Domestic, Plant Room, Swimming Pool, Work in progress, , , , ,

2nd Lease of life continued

Inhouse CAD Design

Work has continued on an old leaky and expensive to run pool which desperately needed a second lease of life. The 80 year old pool had been costing it’s owner an extortionate amount of money to keep running due to its poor condition and lack of insulation. The challenge was to bring the pool up

2nd Lease of life continued Read More »

Domestic, Insulated, Refurbishment, Skimmer, Swimming Pool

Concrete Poured Wimbledon

Another successful concrete pour for a new build development in a Wimbledon basement. The ICF swimming pool system allows the pool shell can be constructed relatively quickly and have any final adjustments made should there be onsite issues. All the pool shell fittings are cast within the pool shell concrete which is vibrated to ensure

Concrete Poured Wimbledon Read More »

Basement, Domestic, Swimming Pool, Work in progress, , , ,