With the pool shell concrete now fully cured, the next phase of the build is underway—installation of the flow and return pipework.
Our team has begun carefully connecting the pool’s hydraulic system, linking the inlets, skimmers, main drains, and vacuum points back to the plant room manifolds. Precision during this stage is crucial to ensure balanced water circulation, efficient filtration, and long-term system reliability.
All pipework is being installed using high-quality, pressure-rated materials suitable for commercial-grade pool systems, with careful routing and alignment to maximise efficiency and serviceability.
This marks a key step forward in the mechanical installation, setting the foundation for the commissioning of the pool equipment and systems in the coming stages.




More updates to follow………