
Another successful concrete pour for a new build development in a Wimbledon basement.
The ICF swimming pool system allows the pool shell can be constructed relatively quickly and have any final adjustments made should there be onsite issues. All the pool shell fittings are cast within the pool shell concrete which is vibrated to ensure there are no air pockets within the pool shell structure.