An 11m x 5m indoor swimming pool has started to take shape within the first day onsite. The pool hall is being constructed at the same time as the pool on the same re-inforced concrete slab. The final leisure suite will also include a gym, sauna and associated changing rooms.
The leisure suite will also benefit from an outdoor infinity spa which will have panoramic views of the surrounding countryside. All the Air/Water handling systems for both pool and spa will be designed by Brookforge and installed by our onsite engineers.




More updates to follow………