New build basement swimming pool

Digging a basement pool hall

Site excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down to a deep end water depth of 2m. The pool will be a skimmer pool […]

New build basement swimming pool Read More »

Slatted thermal pool cover installed and tested in Pershore

A recently completed project in Worcestershire was a new build fully insulated deck level pool. It benefited from the latest energy saving technology in the automated plant-room and a remote controlled slatted thermal pool cover which is hidden away in the floor of the pool. Working directly with the Architect from first conception meant that everything

Slatted thermal pool cover installed and tested in Pershore Read More »

Commissioning Outdoor Overflow Pool

Outdoor slotted overflow swimming pool

An outdoor overflow pool is in the final stages of commissioning with the testing and calibrating of its thermal slatted cover. Down on the south coast of England this pool was designed to be built using the Quadlock ICF system. Using an ICF system means the pool is highly insulated and the addition of a

Commissioning Outdoor Overflow Pool Read More »

Concrete Poured, Pershore

ICF Swimming Pool Build post concrete pour

Concrete Pour Successful The pool shell is cast in a single pour, a homogeneous structure is far stronger than a traditional concrete block construction. The difference in level is to accommodate a cover which is hidden in a ‘pit’. The cover is an insulated slatted design, and features an automatic system which can be controlled

Concrete Poured, Pershore Read More »

Starter Bars Fixed, Construction of Structure Begins, Romsey

[slideshow id=26] The Romsey project is making good progress. The starter bars have been fixed to the slab, and the construction of the pool and balance tanks walls has begun using the Quad-Lock system. For more information about swimming pool construction using Quad-Lock, click here; alternatively contact us on 01242 573572.

Starter Bars Fixed, Construction of Structure Begins, Romsey Read More »

Pool Steps Poured, New Forest

Concrete Poured The concrete for six pool steps is poured. Each step is reinforced and tied to the base, ensuring no movement and increasing tensile strength. The steps house water inlets and underwater LED lights. Due to the modular construction type of Quad-Lock, any design requirements of steps and other elements, are easily achievable. Stainless

Pool Steps Poured, New Forest Read More »

New Forest: Concrete Pour

reinforced concrete pool lid being poured

Today we have successfully poured 52 cubic metres of concrete to form the walls, balance tanks and cover lid. As this post goes live, the concrete is curing; resisting the low temperatures with double sided insulation. This stage is a key development within the project and could not be achieved so quickly with alternative pool

New Forest: Concrete Pour Read More »