Pool Plant Room Manifolds Installation

Here at Brookforge, all of our swimming pool plant room layouts are drawn up in CAD to ensure the pool plant room equipment utilizes the space efficiently. Here in the pictures below we have the swimming pool suction and return manifolds mounted on metal frames to ensure they are safely secured in position prior to the arrival of the pool plant room equipment. Carefully planning out a pool plant room layout at the start can avoid allot hassles later on and will ensure that the necessary space is available.
Pool Plant Room Manifolds Pool Plant Room Manifolds Mounted on metal frames

Swimming Pool Plant Room considerations

Read More…

Pool Pipework Installation for School Pool

Pool Pipework Installation

Commercial Plantroom

Brookforge can offer assistance an expertise for Pool Pipework Installation and the associated plant room equipment and hydraulics when working alongside all of your contractors. That was certainly the case with a recent project in north London.

The client was a small Primary school, who elected a contractor of choice to construct both pool and pool hall. The initial pool and pool hall was designed by the clients architect who had a vision of a unique shape deck level overflow pool.

Brookforge were asked to:

  • Design the pool shell
  • Provide full installation drawings onto there construction/structural drawings
  • Design the pool plant room layout, hydraulics and water treatment systems
  • Pool Pipework Installation
  • Supply and install all pool shell fittings
  • Supply and install all plant room equipment and hydraulics
  • Provide advice and assistance throughout the project.

The plant room benefitted from the latest in automated pool plant equipment such as :