New Build Outdoor Pool

New Build Outdoor Pool

New Build Outdoor Pool Construction

Work has begun on a new build outdoor pool in the the Chilterns near High Wycombe. The swimming pool has been designed by liaising direct with the clients and the initial pool slab has been constructed by local contractors using the drawings and structural calks provided by Brookforge.

The reinforced concrete slab had a 5 days to cure before we could start on the construction of the pool walls at the start of this week. The initial pool shape was marked and had track for the walls cut to size. The Quadlock walls are then constructed in the track and the size and feel of the pool begins to take shape. Once the first course is complete the pool position, location and proportions are double checked and squared up. Now the pool location is finalized the pool wall vertical steal are drilled and anchored into the pool slab and the next courses can fly up within the space of 2 days. Read More…

New design outdoor pool completed

design outdoor pool

A new design outdoor pool has been completed by our in house designers.

Working directly with the customers; our project manager has finalized the designs for this unique pool.

This bespoke swimming pool is ready to go from paper drawings to being constructed onsite over the next 3 weeks.

The pool will be constructed using the Quadlock insulated concrete formwork and will be carried out by our in house team of pool builders. The initial groundworks and pool slab has been completed by the customer’s landscaper by following the installation drawings provided by our designers and structural engineer. Read More…

Hidden overflow pool and spa in basement of new build house

Hidden overflow pool and spa with massage jetsA new build house in Hale, Greater Manchester required a luxury basement pool and spa to compliment a wellness suite. Working directly with the customer and liaising with their architect ensured Brookforge could design and build a hidden overflow pool and spa which fitted within the desired budget.

As this was a basement pool project we were onsite at the very early stage of construction when the excavations were first taking place. Detailed construction drawings were provided to ensure that the project set off on the right footing.

As this was a new build pool and spa in was important that it was highly insulated to comply with PART L guidance to ensure reasonable provisions were made to limit heat losses. An obvious choice of construction was to use an ICF system (insulated concrete formwork).

The Quadlock ICF system aloud for quick and easy construction for the swimming pool with integrated spa and a hidden overflow helped create a very tidy and contemporary finish. Read More…

New build swimming pool with metal overflow

New Build Swimming Pool With Metal Overflow Grating PoolA new build swimming pool constructed near Romsey. The overflow swimming pool was built using the quadlock ICF system. Using insulated concrete formwork (ICF) ensures that the pool is highly insulated and structurally solid.

The new build swimming pool benefited from luxury stainless steel parallel grating tiles , the grating tiles are designed to be extra wide ensure the pool surround area is kept dry. The balance tank was directly below the overflow and the water entered the tank via shoot to minimise any unwanted water noises.

To ensure the balance tank was hard wearing, easy to maintain and water tight it was fibre glassed onsite.

Read More…

New build basement swimming pool

Digging a basement pool hallSite excavation work has started on a new build basement swimming pool in London. The pool will be 20 meters in length and will have 2 depths with sloped riser between them. The shallow water depth is 1.3m going down to a deep end water depth of 2m.

The pool will be a skimmer pool with a 150mm freeboard to the surround floor tiles, it will also benefit from a remotely controlled hidden thermal slatted cover.

The pool hall will be built from scratch and will be located below an existing garden.

Working closely with the architects and mira construction, Brookforge will be designing, building, tanking, tiling and piping up everything pool related.

The plant room and all the associated equipment will be installed and tested by Brookforge as well as the pool hall air handling, dehumidification and ducting systems. Read More…