Brookforge Swimming Pool Build

automatic topup

Refurbishment Project: Tiling begins, Cheltenham

Tiling of swimming pool shell walls

Tiling has begun at our local site, a refurbishment project to both house and modernise a dated, outdoor pool. The previous tiles have been removed, the shell has had its depth increased and has been tanked. The tile adhesive used is a rapid curing, water resistant product. More about the adhesive can be found here.

Refurbishment Project: Tiling begins, Cheltenham Read More »

Outdoor to Indoor Pool Refurbishment, Cheltenham

Pool cover pit before tiling

The client asked Brookforge to convert an existing outdoor pool into a modern indoor pool. A pool hall has been constructed, enabling year round use of the pool. Additional features include: Depth increase Sprayed waterproof tanking Re-tiling of the pool and surround Stainless steel skimmers with automatic top-up Hidden, insulated slatted cover Heatstar air handling

Outdoor to Indoor Pool Refurbishment, Cheltenham Read More »

Southampton: Refurbishment Project

Swimming pool refurbishment

We were asked to refurbish and improve an outdoor pool that was to be housed for year round use. The specification included increasing the depth of the entire pool, installing skimmers with an automatic top up, fitting new lights and install a modern plant room. A Calorex Delta air handling unit along with all duct-work

Southampton: Refurbishment Project Read More »

Completion: Luxury Deck Level Pool and Spa

A perfect union of minimalism and grandeur. It is hard to believe that a commercially rated, fully insulated 18m swimming pool and separate spa are concealed within this subtle design. With the covers open, the space in front of the house is transformed into an area of tranquility and repose, a space in which to socialise, entertain and soak

Completion: Luxury Deck Level Pool and Spa Read More »

Completion: Private School Refurbishment, Oxford

School pool being refilled after refurbishment

A complete refurbishment of an existing liner pool at an independent school in Oxford. The pool needed updating with a new commercial grade liner, stainless steel skimmers and handrails.The depth was also reduced to bring down the running costs; as there is a lower volume of water, less is spent on heating and consumables. The

Completion: Private School Refurbishment, Oxford Read More »

Scroll to Top